Mmd Milled Cable Drill Pipe Measurements with Drilling
HomeHome > Products > Drill Pipe > Mmd Milled Cable Drill Pipe Measurements with Drilling
Mmd Milled Cable Drill Pipe Measurements with Drilling

Mmd Milled Cable Drill Pipe Measurements with Drilling

Product Description The signal transmission mode of the drilling measurement system is divided into wired (cable) and wi
Basic Info
Model NO. 89mm
Transport Package Wooden Box
Specification 89mm
Trademark Huaxin drilling tools
Origin Linxi County, Hebei Province, China
HS Code 8207191000
Production Capacity 20000
Product Description

No

Dia.

Length

Insulation connector resistance

Cable conductor resistance

Water pressure

Shape

Steel Grade

1

φ70mm

1500~3000mm

≥500MΩ

0.5~1.5Ω

7~10Mpa

Round face type, groove type
Square milling type

G105, S135

2

φ73mm

1500~3000mm

≥500MΩ

0.5~1.5Ω

7~10Mpa

3

φ76mm

1500~3000mm

≥500MΩ

0.5~1.5Ω

7~10Mpa

4

φ89mm

1500~3000mm

≥500MΩ

0.5~1.5Ω

7~10Mpa


The signal transmission mode of the drilling measurement system is divided into wired (cable) and wireless. Through the study of various signal transmission methods, it is believed that the mud pulse, electromagnetic wave, sound wave and other linear transmission methods can not yet adapt to the construction conditions of coal mines and near-water directional holes: and the wired (cable) method has the advantages of simple structural principle, good real-time and high data transmission rate, and can directly supply power to the sensor at the bottom of the hole through the cable, realize the two-way communication between the bottom of the hole and the orifice equipment, and can meet the conditions for the construction of near-horizontal directional drilling under the coal mine. Early use of cable for drilling parameter measurement, cable is generally set outside the drill pipe, measurement needs to be drilled, through the cable will be the measurement instrument under the hole for drilling parameters side volume, so that the measurement will delay the normal drilling, can not achieve immediate measurement with drilling; Later wired transmission is carried out through the drill pipe "buried cable" method, through the special structure of the drill pipe structure to achieve the connection of the cable when adding the drill pipe, without affecting the normal drilling can achieve instant measurement with the drill. The key technology for signal transmission using the drill pipe "buried cable" method is to solve the problem of sealing and effective conduction of the drill pipe joint.
The central cable device is composed of a one-piece drill pipe composed of a drill pipe, and the central cable device is composed of a female connector of the cable, an insulated support ring, an insulated joint, an intermediate conductor, a male connector of the cable, a reducer spring, etc.: the external of the intermediate wire is provided with an insulated joint, and its two ends are the female connector of the cable, the male connector of the cable, and the reducer spring is set on the nipple, which is connected with the female connector of the inner coneQ: Are you a manufacturer or trading company?
A: We are a specialized manufacturer.

Q: What are your main products and what are their uses?
A: Our products are mainly used for drilling and surveying, and the products are drill pipe and drill bits. They are used for underground work in coal mines.

Q: What are the payment terms?
A: Our payment terms are 30% deposit in advance to start production, and the remaining payment is settled before leaving the factory


Q: We have customized models, do you need us to provide samples?
A: Yes, each specification size is more, or mainly samples.

Q: What is the after-sales service?
A: Our after-sales staff is online 24 hours a day, and the after-sales staff is received at any time, such as quality problems, we will replace unconditionally.